ctrlflw signal capture
Kono Kogs, Inc.

Kono Kogs, Inc. buyer-window signal capture

Ten plants for Kono Kogs where a dated public record shows an oxidizer project moving now: a filed permit, a draft in comment, an approval to replace an RTO, or a court clock. Each record gives the trigger, the source, an opening and what the record does not prove.

01 Coating Place, LLCHigh confidence Coating Place, a Wurster coating specialist, runs 24 fluid bed coaters. Its Wisconsin construction permit was filed 10/19/2026 and is still pending, with no draft issued. The application adds a second RTO, C07, as a backup to the plant's existing RTO. The filing lists the RTO maker and model as TBD. View evidence, opening, contactHide details

Evidence

  • The application proposes a new regenerative thermal oxidizer, C07, redundant to the existing RTO C06, to control the Wurster coaters.
  • The oxidizer form for C07 lists the manufacturer and model number as TBD.
  • WDNR lists construction permit 26-MIN-123 as received 10/19/2026, complete 11/08/2026 and still requested, with no draft or public notice.
Practical opening

“Its Wisconsin construction permit was filed 10/19/2026 and is still pending, with no draft issued. The application adds a second RTO, C07, as a backup to the plant's existing RTO. So the RTO is in a filed, pending permit and no maker is named. We could get a new or refurbished RTO quote in front of them while the filing still says TBD.”

Claim boundaryDo not say no vendor is involved; TBD only means the filing names none.

The form lists an 8/1/2026 install date that predates the filing, so a quote may already be out.

02 Fibrosan Inc.High confidence Fibrosan's permit is for a new fiber reinforced plastic plant that Michigan classes as a major source. Michigan's list dated 11/13/2026 still shows its air permit pending decision. In August the village announced Fibrosan committed to add an RTO to the plant's final design. View evidence, opening, contactHide details

Evidence

  • The Village of Cassopolis announced that Fibrosan committed to incorporate an RTO into the facility's final design, subject to EGLE review and approval.
  • EGLE's list of permits pending decision, revised 11/13/2026, still includes Fibrosan Inc. PKG-0001103.
Practical opening

“Michigan's list dated 11/13/2026 still shows its air permit pending decision. In August the village announced Fibrosan committed to add an RTO to the plant's final design. So the RTO is in the design and the permit decision is still open. We could offer a refurbished RTO as the faster, lower-cost route while the permit is decided.”

Claim boundaryDo not say the RTO is approved or bought; the permit is still pending.

The RTO is proposed, not yet approved; the plant has had local opposition.

03 3M Company, Menomonie PlantHigh confidence 3M is adding a ceramic fiber line, PCF13, at its Menomonie, Wisconsin plant. The line vents to a new thermal oxidizer, C08, with the maker listed as TBD. Wisconsin let 3M start building on 2026-05-28, before the permit is issued. On 2026-11-18 the construction permit was still listed as pending. View evidence, opening, contactHide details

Evidence

  • The application routes the new line's emissions to a new thermal oxidizer, C08, whose form lists manufacturer and model as TBD.
  • WDNR approved on 2026-05-28 3M's request for a waiver to commence construction before the permit.
  • WDNR permit tracking on 2026-11-18 lists 26-MIN-062, received 05/20/2026, as still requested.
Practical opening

“Wisconsin let 3M start building on 2026-05-28, before the permit is issued. The line vents to a new thermal oxidizer, C08, with the maker listed as TBD. So a new oxidizer is in an active build with no maker in the filing. We could ask the plant's environmental engineer whether C08 is still open to quote.”

Claim boundaryDo not say the oxidizer is unbought; the waiver has been in place since May.

The waiver has been in place since May, so the C08 order may already be placed.

04 Toyo Tire North America Manufacturing, Inc.High confidence Toyo Tire's White, Georgia tire plant is permitted for up to 309,000,000 pounds of rubber a year. Georgia posted the draft permit, and public comment closes November 20, 2026. The permit covers a new rubber mixer controlled by a new RTO. View evidence, opening, contactHide details

Evidence

  • Application 29692 covers an additional batch mixer with dust collectors and a regenerative thermal oxidizer for VOC and HAP control.
  • Georgia EPD posted Toyo Tire's proposed permit for Application 29692 with comments closing November 20, 2026.
Practical opening

“Georgia posted the draft permit, and public comment closes November 20, 2026. The permit covers a new rubber mixer controlled by a new RTO. So the RTO permit is in its last public step and names no vendor. We could ask Toyo whether the mixer RTO is placed or still open.”

Claim boundaryDo not say the vendor is open; the RTO is specified as electrically powered.

The mixer building has been under construction since early 2026 and an electric RTO is specified, so a vendor may already be set.

05 Hanwha Q Cells Georgia, Inc.High confidence Qcells' Cartersville, Georgia solar plant adds 3.3 GW of ingot, wafer and cell capacity and 3.5 GW of modules. Qcells filed Georgia air permit application 30376 in October 2026; no draft is posted yet. The application adds a rotary concentrator and a regenerative thermal oxidizer. View evidence, opening, contactHide details

Evidence

  • Application 30376 is for the addition of a rotary concentrator, a regenerative thermal oxidizer, rooftop units and five emergency generators.
  • Georgia EPD's October 2026 advisory lists Hanwha Q Cells Georgia Application 30376 as a permit application.
Practical opening

“Qcells filed Georgia air permit application 30376 in October 2026; no draft is posted yet. The application adds a rotary concentrator and a regenerative thermal oxidizer. So the concentrator and RTO are at the earliest public step. We could ask Cartersville's EHS lead whether the concentrator package is still open.”

Claim boundaryDo not give a Cartersville headcount; the company's job figure covers two sites.

Application stage only; on a project this size the parent or its contractor may choose the abatement vendor.

06 Kawneer Company, Inc.High confidence Kawneer makes architectural aluminum curtain wall, window wall, doors and entrances. Pennsylvania issued the plan approval on September 9, 2026; it runs to March 8, 2028. It covers a new RTO replacing the existing RTO, control device C001, at Bloomsburg. View evidence, opening, contactHide details

Evidence

  • The plan approval covers a new regenerative thermal oxidizer replacing the existing RTO, Control Device C001, at the Bloomsburg plant.
  • Pennsylvania DEP issued plan approval 19-00020A to Kawneer's Bloomsburg plant on September 9, 2026, expiring March 8, 2028.
Practical opening

“Pennsylvania issued the plan approval on September 9, 2026; it runs to March 8, 2028. It covers a new RTO replacing the existing RTO, control device C001, at Bloomsburg. So the RTO replacement is approved and the install window is open. We could offer a refurbished RTO quote or the install and removal of the old unit.”

Claim boundaryDo not say the vendor is open; the make may be fixed in the April application.

Plan approval already issued on September 9, 2026; the new RTO's make and model may be fixed in the application.

07 Pepperidge Farm, IncorporatedHigh confidence Pepperidge Farm runs a commercial bakery in Downers Grove, Illinois. Illinois issued the construction permit on July 7, 2026 for a new baking line. The new oven vents to a new catalytic oxidizer. View evidence, opening, contactHide details

Evidence

  • Oven VOM and HAP emissions would be controlled by a new natural gas-fired catalytic oxidizer.
  • Illinois EPA issued final construction permit 26020013 on July 7, 2026, for a new baking line replacing Baking Line 2.
Practical opening

“Illinois issued the construction permit on July 7, 2026 for a new baking line. The new oven vents to a new catalytic oxidizer. So the oxidizer is permitted for a line not yet shown built. We could ask whether the oven oxidizer is placed or if service and startup are open.”

Claim boundaryDo not say the oxidizer is unbought; the permit has been final since July.

Permit final since July 7, 2026; the catalytic oxidizer may already be on order, and no vendor is named.

08 A-F Acquisition LLC (Pullman Innovations)Conditional causal link Pullman Innovations turns byproduct edible oil into animal feed in Chicago. The state halted the plant on October 14, 2026 and seeks an order to have an RTO running within 120 days. Illinois EPA permitted the new RTO on June 1, 2026. View evidence, opening, contactHide details

Evidence

  • On October 14, 2026 the Illinois Attorney General halted the plant and said a motion would seek an order to complete installation and start an RTO within 120 days.
  • On June 1, 2026 Illinois EPA issued Pullman a construction permit to install a new RTO.
Practical opening

“The state halted the plant on October 14, 2026 and seeks an order to have an RTO running within 120 days. Illinois EPA permitted the new RTO on June 1, 2026. That suggests the RTO is their way back to running, but the unit may already be bought. We could offer installation, startup or a fast refurbished unit, whichever the court timetable leaves open.”

Claim boundaryDo not say the RTO is unbought; the state's wording is to complete installation.

Court-driven and in litigation; the RTO may already be bought or partly installed.

09 Abet USAConditional causal link Abet USA's Johnson Creek, Wisconsin facility is classed as a laminated plastics plate and sheet plant. Construction began on May 18, 2026. Both resin treaters vent to a new 10 million Btu per hour thermal oxidizer. Abet plans to close its Oconomowoc and Ashippun plants and move to Johnson Creek. View evidence, opening, contactHide details

Evidence

  • VOC and HAP from both resin treaters will be controlled by a thermal oxidizer with a 10 million Btu per hour heat input.
  • Abet's consultant notified WDNR that construction began on May 18, 2026.
  • Abet intends to close its existing Oconomowoc and Ashippun facilities and relocate operations to Johnson Creek.
Practical opening

“Construction began on May 18, 2026. Both resin treaters vent to a new 10 million Btu per hour thermal oxidizer. That suggests oxidizer work at a plant still being built, but the unit may already be ordered. We could ask who installs the oxidizer and whether the closing plants have units to sell.”

Claim boundaryDo not say the closing plants have oxidizers; that was not checked.

Construction began in May 2026, so the oxidizer vendor may already be chosen.

10 Amcor Flexibles North America (Oshkosh)Conditional causal link Amcor runs a flexible packaging film plant at 2450 Badger Ave in Oshkosh, Wisconsin. Wisconsin recorded a decision on 11/17/2026 on its filing for a new press and RTO. The filing names the incoming RTO as a 60,000 scfm Megtec CS-600-95 with a serial number. The filing lists a November 2026 installation start. View evidence, opening, contactHide details

Evidence

  • Amcor's filing says the RTO is a Megtec Systems CS-600-95, serial number 115337, rated 60,000 scfm.
  • The filing lists a November 2026 installation start.
  • WDNR recorded exemption 26-EXM-129 as received 11/10/2026 with a decision on 11/17/2026.
Practical opening

“Wisconsin recorded a decision on 11/17/2026 on its filing for a new press and RTO. The filing names the incoming RTO as a 60,000 scfm Megtec CS-600-95 with a serial number. That suggests the install work is open, but the oxidizer itself is already chosen. We could offer rigging, installation, tie-in and startup for the incoming unit.”

Claim boundaryDo not say the oxidizer sale is open; the unit is named by serial number.

The unit is already selected and arriving; the open work is install and startup, not the oxidizer sale.

These signals rank research priority. They do not prove purchase intent.